Steel Cement Sand Need For Sqft
Steel Cement Sand Need For Sqft
Zhengzhou, Henan China
24 hours At your service

Steel Cement Sand Need For Sqft

Calculate the requirements of Sand , Bricks and Cement ...

Sand , Bricks and Cement; steel is require 1sqft of area; compressive strength brick

Quantity of cement sand and aggregates for 1600 sq.ft slab ...

26-12-2019  so more quantity of cement sand and aggregate is required and dry volume is increased by 54% of wet volume so we can multiply cofactor 1.54 in wet volume to calculate dry volume. Dry volume = 18.9 m3× 1.54 = 29m3. Steel reinforcement required for slab of 1600 square feet.

Quantity of cement sand and aggregate for1500 sq ft slab ...

21-07-2019  So weight of Steel bar is require for 1500 square feet Roof slab= 1602.8kg If Market rate of steel bar is 60 rupees per kg then. total cost of Steel bar =1602.8×rs 60 Total cost= Rs 96172. How much quantity of sand required for Roof cast of rcc slab. In

What's the quantity of steel, cement and sand for 1100 ...

You are interested to know the material consumption for a RCC slab of 1100 Sqft. You have not cited any data like : 1. Slab thickness 2. Configuration and sizes of beams 3. Concrete mix 4. Nominal mix or design mix 5. One way or Two way slab 6. On...

Quantity Of Cement, Sand, Aggregates Steel For 1000 sq ...

Part-01https://youtu/Yx4fTBJF6BY#Part_01_in_the_descriptionHow much steel and cement is required for a 1000 sq ft RCC house?#How_much_steel_is_required_fo...

Cement sand calculation for tiles of 100 sq.ft area ...

Flooring tile instalation required for 100 sq.ft. Cement quantity = 4 bags cement. Sand required = 12.468 cubic feet. Hence flooring tile instalation required for 1000 sq.ft. A) cement quantity calculation. 100 sq. ft = 4 bags cement. 1 sq. ft = 4/100 bags

Quantity of Cement , steel Aggregate for 1100 sqft area ...

Quantity of Cement , steel Aggregate for 1100 sqft area of an RCC Flat Slab? 2019-07-04 2019-07-04 civilsitevisit 0 Comments In This Article i will tell you thumb rule for direct estimation of material quantity for 1100 sqft Slab .The quantities of the materials largely depend on the design of the roof slab.

Concrete Calculator - Estimate Cement, Sand, Gravel ...

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

What's the quantity of steel, cement and sand for 1100 ...

Only River sand is to be used or Crushed sand is also being used : River sand; Grade of cement and Steel bars being used : OPC 53, Fe 500; Reinforcement details : NA; NA: Not available. Now let us have a preliminary estimate : Slab area : 1100 Sqft =1100/10.76= 102.23 SqM. Volume : 102.23*0.15=15.33 Cum. For 1 cum of concrete of grade M 20, Cement : 7.95Bags

Quantity Of Cement, Sand, Aggregates For 1000 sq ft

Cement, Sand, Aggregates For 1000 sq ft Slab: To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq. m. The minimum thickness provided for the slab is 150 mm.

How much Cement, Sand Water required for

12-09-2018  Quantity of Sand = Quantity of Cement x 4. ∴ Quantity of Sand = 0.3888 m³ x 4 = 1.5552 m³. ∵ 1 m³=35.3147 Cubic Feet (CFT) Quantity of sand = 1.5552 x 35.3147 = 54.921 CFT. ∵ 1 brass = 100 CFT. Sand = 54.921 /100 =0.54921 Brass. ∵ Density of sand = 1920 kg/m³. Weight of sand = 1.5552 x 1920 = 2985.98 kg. ∵ 1 tonne = 1000 kg. Weight of sand in Tonne = 2985.98 /1000 =2.985

Quantity of Cement , steel Aggregate for 1100 sqft

Only River sand is to be used ; Grade of cement and Steel bars being used : OPC 53, Fe 500; Step 1. Slab area : 1100 Sqft = 1100/10.76 = 102.23 Sqm. Volume : 102.23*0.15=15.33 Cum. Step 2. Thumb rule :-For 1 cum of concrete of grade M 20, Cement : 7.95Bags; Sand : 0.146 Brass; Aggregate :0.292 Brass. Steel bars : 80Kg /cum; Step 3.

1400 Sq.ft RCC roof how much Steel,Sand,Jally Cement ...

For 1400 sft area slab 1;2;4 ratio with out beam taking 4.5'' thickness the material is. cement= 90 bags, Bazri= 500cft, coarse sand= 300 cft, Ms steel bars= 1500 kg. Fri Jul 03, 2020.

How much steel, cement, are required for an 800 sq. ft ...

How much steel and cement is required for a 1000 sq ft RCC house? The material required for a 1000 Sqft built-up RC building: Foundation stone (along with exterior wall only): 7 brass

How to Calculate Quantity of Cement, Sand, Aggregate

30-01-2018  How to Calculate Quantity of Cement, Sand, Aggregate and Steel in Slab Flat slab reinforcement - YouTube.

How much cement, iron and bricks are needed for 500

You can calculate your material requirement by multiplying the built-up area with the consumption ratio. i.e., in your case: Cement required = 500 sqft X 0.4 Bags/sqft = 200 Bags Hope our Infographic helped. If then share and give credits.

Construction cost of RCC slab of 1100 square feet - Civil Sir

1177 Kg Steel required for roof casting of 1100 sq ft rcc slab. If Market rate of steel bar is 60 rupees per kg then. total cost of Steel bar =1177 × rs 60. Total cost = Rs 70600. Sand required for 1100 sq ft slab. In M20 ratio of sand cement and aggregate is 1:1.5:3 ,in this ratio 1.5 part is sand. Total proportion =1+1.5+3=5.5. Volume of sand in cft

Concrete Calculator - Estimate Cement, Sand, Gravel ...

Concrete mix estimation. Our mix-on-site concrete calculation is based on batching by volume (Large construction sites employ batching by weight which is more exact). You can also estimate the quantity of sand and gravel required by weight; Simply multiply the volumetric quantity of sand and gravel with 1400 kg/m 3 (bulk density of sand) and 1600 ...

Quantity Of Cement Sand Required For 100 Sq.ft ...

Area of plaster = 100 sq.ft = 9.29 m². Thickness of plaster = 12 mm = 0.012 m. Mix ratio of plaster = cement : sand = 1: 4. Volume of plaster = Area of plaster x Thickness of plaster = 9.29 x 0.012 = 0.11 m³. Now we need to add extra 20% for joint filling,

How much Cement, Sand Water required for

12-09-2018  Quantity of Sand = Quantity of Cement x 4. ∴ Quantity of Sand = 0.3888 m³ x 4 = 1.5552 m³. ∵ 1 m³=35.3147 Cubic Feet (CFT) Quantity of sand = 1.5552 x 35.3147 = 54.921 CFT. ∵ 1 brass = 100 CFT. Sand = 54.921 /100 =0.54921 Brass. ∵ Density of sand = 1920 kg/m³. Weight of sand = 1.5552 x 1920 = 2985.98 kg. ∵ 1 tonne = 1000 kg. Weight of sand in Tonne = 2985.98 /1000 =2.985

1400 Sq.ft RCC roof how much Steel,Sand,Jally Cement ...

For 1400 sft area slab 1;2;4 ratio with out beam taking 4.5'' thickness the material is. cement= 90 bags, Bazri= 500cft, coarse sand= 300 cft, Ms steel bars= 1500 kg. Fri Jul 03, 2020.

Quantity of Cement , steel Aggregate for 1100 sqft

Only River sand is to be used ; Grade of cement and Steel bars being used : OPC 53, Fe 500; Step 1. Slab area : 1100 Sqft = 1100/10.76 = 102.23 Sqm. Volume : 102.23*0.15=15.33 Cum. Step 2. Thumb rule :-For 1 cum of concrete of grade M 20, Cement : 7.95Bags; Sand : 0.146 Brass; Aggregate :0.292 Brass. Steel bars : 80Kg /cum; Step 3.

Calculation of Cement and Sand Quantity for Plastering

Cement needed would be = (50/0.153)x 0.12 = 39.21 kgs. or 0.784 bags. Sand needed would be = (230/0.153)x 0.12 = 180 kgs or 5 cft. Bulkage of Sand is not taken into account. A correction for bulkage has to be taken into account. Water needed would be = (56/0.153) x 0.12 = 44 liters.

Raw Material Calculator for Construction - Jk Lakshmi

You will need the following quantities to complete the construction of wall: bags of Cement (50 Kg each) CFT Sand CFT Stone Aggregates (10 mm) CFT Stone Aggregates (20 mm) Bricks . Kg Reinforcement Steel . Please click on the buttons below for more information about our products.

How to Calculate Quantities of Cement, Sand and

So 1.54 Cum of dry materials (cement, sand and aggregate) is required to produce 1 Cum of concrete. Volume of Cement required = 1/(1+2+4) X 1.54 = 1/7 X 1.54 = 0.22 Cum. Volume of Sand required = 2/7 X 1.54 = 0.44 Cum or 15.53 cft. Volume of Aggregate required = 4/7 X 1.54 = 0.88 Cum or 31.05 cft. Note: 1 cubic meter = 35.29 cubic feet

Concrete Calculator - Estimate Cement, Sand, Gravel ...

Concrete mix estimation. Our mix-on-site concrete calculation is based on batching by volume (Large construction sites employ batching by weight which is more exact). You can also estimate the quantity of sand and gravel required by weight; Simply multiply the volumetric quantity of sand and gravel with 1400 kg/m 3 (bulk density of sand) and 1600 ...

cement and steel requirement for 100 sft - BINQ Mining

Construction costs to surge 17% on rising steel, cement tags 24 Mar 2004 It is estimated that housing construction requires up to 45 bags of cement for every 100 sq ft and 3 to kg of steel per sq ft. At current prices, it »More detailed

Concrete Material Calculator - Sand, Cement And

Concrete Material Calculator. Volume Of Concrete. Add Your Concrete Proportion (for Example : Ratio is (1 : 2 : 4) , Enter 1 in cement , 2 in Sand and 4 in Aggregate. Cement.